| R&B
IGO 36
The problem
The site of an EPD project being constructed by SDC
was enclosed on 3 sides with no oversailing rights.
The only material storage & distribution area
was from an inner courtyard. There was no way of distributing
materials to 2 sides and the rear of the building.
The solution
R&B installed an IGO36 which when folded could
operate of be left out of service at a redius of 14m.
This prevented oversailing problems while allowing
distribution of all materials to their final location.
The result
The project was completed successfully and
on time. Our client's Contract Manager was delighted
with our standard of personal service.
Following this first successful
experience, SDC have used R&B's unique 'contruction
logistics' approach to deliver the optimum materials
handling solution on six more projects in the following
18 months.
|